Find Jobs
Hire Freelancers

ASP Gantt Chart for Project Management System

$100-125 USD

Terminado
Publicado hace alrededor de 19 años

$100-125 USD

Pagado a la entrega
Need a dynamically created Gantt chart to integrate into existing ASP-based project management software (demo available at [[login to view URL]][1]). Must graphically represent relationships between tasks in the project flow, and differentiate critical-path from non-critical-path tasks. Must also graphically represent percentage of work done for each task. Tasks shown in the chart must link to details for the task (task details are an existing part of the system; only the link needs to be set up). Chart may be either html or flash format, so long as it integrates with the existing system. Access database is designed to contain all necessary information for population of the chart, including: task start date, task end date, duration, relationship to other tasks, critical path indication, etc. All necessary information is contained in one table except the completion percentage for each task, which is a simple calculation based on information in a related table. ******Update******** To log in to the demo site mentioned above, use "demo" as the username & password. ## Deliverables Rent A Coder requirements notice: As originally posted, this bid request does not have complete details. Should a dispute arise and this project go into arbitration "as is", the contract's vagueness might cause it to be interpreted against you, even though you were acting in good-faith. So for your protection, if you are interested in this project, please work-out and document the requirements onsite. 1) Complete and fully-functional working program(s) in executable form as well as complete source code of all work done. 2) Deliverables must be in ready-to-run condition, as follows (depending on the nature of the deliverables): a) For web sites or other server-side deliverables intended to only ever exist in one place in the Buyer's environment--Deliverables must be installed by the Seller in ready-to-run condition in the Buyer's environment. b) For all others including desktop software or software the buyer intends to distribute: A software installation package that will install the software in ready-to-run condition on the platform(s) specified in this bid request. 3) All deliverables will be considered "work made for hire" under U.S. Copyright law. Buyer will receive exclusive and complete copyrights to all work purchased. (No GPL, GNU, 3rd party components, etc. unless all copyright ramifications are explained AND AGREED TO by the buyer on the site per the coder's Seller Legal Agreement). 4) Well-commented code for future reference ## Platform ASP
ID del proyecto: 3562579

Información sobre el proyecto

3 propuestas
Proyecto remoto
Activo hace 19 años

¿Buscas ganar dinero?

Beneficios de presentar ofertas en Freelancer

Fija tu plazo y presupuesto
Cobra por tu trabajo
Describe tu propuesta
Es gratis registrarse y presentar ofertas en los trabajos
Adjudicado a:
Avatar del usuario
See private message.
$85 USD en 10 días
5,0 (16 comentarios)
4,3
4,3
3 freelancers están ofertando un promedio de $88 USD por este trabajo
Avatar del usuario
See private message.
$89,25 USD en 10 días
5,0 (12 comentarios)
3,7
3,7
Avatar del usuario
See private message.
$90,10 USD en 10 días
0,0 (0 comentarios)
0,0
0,0

Sobre este cliente

Bandera de UNITED STATES
Louisville, United States
5,0
25
Forma de pago verificada
Miembro desde feb 10, 2005

Verificación del cliente

¡Gracias! Te hemos enviado un enlace para reclamar tu crédito gratuito.
Algo salió mal al enviar tu correo electrónico. Por favor, intenta de nuevo.
Usuarios registrados Total de empleos publicados
Freelancer ® is a registered Trademark of Freelancer Technology Pty Limited (ACN 142 189 759)
Copyright © 2024 Freelancer Technology Pty Limited (ACN 142 189 759)
Cargando visualización previa
Permiso concedido para Geolocalización.
Tu sesión de acceso ha expirado y has sido desconectado. Por favor, inica sesión nuevamente.