I am very good at Excel and VBA in Excel. I am very confident about this project.
Education: Management PhD.
(1) 2000-2004
PhD. School of Management, Shanghai Jiaotong University, Major: Management Science and Engineering
Study,,,etc.
Doctor Dissertation Title: Research on the Oil Price Fluctuation and Risk Management
(2) 1997-2000
Master Degree, School of Management, Dalian University of Technology, Major: Management Science and Engineering
Study,,,,
etc.
Master Dissertation Title: Production Plan Support System
(3) 1993-1997
Bachelor Degree, School of Chemistry, Dalian University of Technology, Major: Applied Chemistry
Study,,,, etc.
By years of study, I master the knowledge of chemistry and management. I also published over 10 articles on the publication, and took part in several research project. Because of excellent mathematics, I had won the first prize in mathematics competition.
Working Experience
2005,1-Current: Toyo Heavy Industry(Dalian)Co.,Ltd.
Company Introduction: We produce hydraulic system(including pumps, valves, cylinders, etc) according to customer’s requirement. Using the Numerical Controlled Lathe and Machining Center as basic manufacture tool, 96% of our products are sold to Japan, 3% of our products are sold to America, 1% of our products are sold in China. There are about 220 employees.
Duty:
1 Production Scheduling
I make the production plan by analyze the customer orderassembly capacity and producing plan, and assign the daily workshop producing. The production plan must assign every CNC every day duty.
2 Information Officer
I develop production information system for my company. It has the MRP function, and has been used in routine operation. This system is B/S way, the database is SQL SERVER.
3 English Translator
My English is better than other colleagues in my company. All the English Contact is charged by me. I had translated English Contracts, mechanical drawings, hydraulic technical information, etc.
The production management system, which I developed, greatly improved the efficiency of making plan, order contact and searching production information. For example, in the past, it will take more than a day to checking the remaining order amount, now, one hour is enough. This system greatly improve our company information construction level.